This project aims to create a series of demonstration power plant water. And the operation of the circuit Inverter split by the end of demonstration runs as follows. Theory and documents relating to the source of electrical power water power the working principle of the circuit. Inverter the principle of integrated battery charger main circuit voltage VDC LED LED SMD (Surface-Mounted-Device) a voltmeter. Ammeters digital LCD display couples. Make plans to offer advisors the project approved. Design demonstration kit Equipment supply and assembly Assembly and demonstration the production of electricity from hydropower 220 VAC test run is a series of demonstrations to generate electricity from water power to 220 VAC storage performance voltage and current output. And analyze the results of the operation of the demonstration production of electricity from hydropower 220 VAC and conclusions in this chapter are the results of the experiment demonstrated the production of electricity from hydropower and the conclusion of the trial in order to be used. effectiveness of the objectives of the experimental procedure the results can not load a load test. Test kits demonstration power plant and the demonstration set to produce 220 volts for 25 minutes at a constant voltage. The electricity does not increase or decrease. Always works The term of office is fixed or reduced by the ratio of active power increases.