จำนวน Repository ( 255 )
การวิเคราะห์คุณภาพไฟฟ้าในระบบจำหน่ายไฟฟ้าที่มีแหล่งผลิตไฟฟ้าพลังงานลม
This Thesis presents an analysis of wind turbines in a power distribution system that has a wind power source. By comparing the wind turbine with 3 blades and 4 wind turbines while there is no distribution in the distribution system. And the load is distributed in the distribution system To analyze the differences of these 2 wind turbines analyze the pressure values The power quality in the distribution system that occurs. And able to apply wind turbine energy for sustainability And practices to support the correct power supply In the distribution system and able to provide electricity with efficiency and reliability Wind turbine when connecting to the electricity distribution system There is a significant impact on the power distribution system such as the impact on the power loss. Pressure impact etc. It can be seen that the wind turbine with 3 blades works less than the wind turbine with 4 blades not so much. Therefore the test shows that the analysis of the electricity quality in this distribution system for use as a case study And continue to improve the production of wind turbines in the electricity distribution system.
การพัฒนาระบบป้องกันอุบัติเหตุทางถนน กรณีศึกษา บริเวณแยกขามสะแกแสง อำเภอโนนไทย จังหวัดนครราชสีมา
This research aims to develop a road accident prevention system to reduce the risk of accident a case study of Kamsakasang Junction Non-Thai District Nakhon Ratchasima Province. The target audiences are: traffic experts and 15 civil engineers to evaluated the developed system. From the study of traffic problem and risk areas there are 7 aspects to be improved: 1) Installation of traffic light 2) Installation of lighting and changing control cabinet 3) Improvement of the traffic island 4) Changing lower traffic island to higher one 5) Painting reflecting colour and reflecting light on the edge of the island 6) Drawing traffic line 7) Installation of warning signs. From the development of accident prevention system and evaluated by the experts; the overall evaluation of the system was the best (x = 4.66 SD = 0.41). There were 6 highest rated aspects and 1 very good aspect. The highest rated were installation of Vehicle Actuated traffic light (x = 4.92 SD = 0.15). As result of the development of road accident prevention system in 2014 the accident statistics were reduced by 53.85% compared to the pre-installation period. The statistics are reduced so it can be concluded that the road accident prevention system can be used effectively and it can be applied to other risk areas.
ประสิทธิภาพรายงานการเงินจากระบบบริหารการเงินการคลัง ภาครัฐแบบอิเล็กทรอนิกส์ (GFMIS) ของสำนักงานคณะกรรมการ การอาชีวศึกษา
The purposes of this study were to 1 ) study problems of the inventory administration of the Office of the Teacher Civil Service and Educational Personnel Commission in terms of supplying controlling and exterminating the inventory and 2 ) examine solutions to problems to improve of the inventory administration of the Office of the Teacher Civil Service and Educational Personnel Commission to operate more efficiently effectively transparently and verifiably. The research population consisted of 5 0 direct staff members working in the field of office supplies in the Office of the Teacher Civil Service and Educational Personnel Commission. The instruments used for data collection were questionnaires and statistics used for data analysis included percentage mean and standard deviation. The results of the research revealed that the problem of the administration of the inventory administration of the Office of the Teacher Civil Service and Educational Personnel Commission in the overall was moderate. When considering each aspect it was found that the inventory control aspect was the most problematic for the lack of places to store deteriorated items and exterminate within a specified period of time. The solution was to create a manual and schedule to operate the inventory more effectively. Secondly there was a problem with the cost of the inventory needed by the users that was always higher than the government standard. To solve this problem a survey on the material requirements of the internal units should be conducted before ค setting a budget for the materials to meet the current market price by all parties involved in the budget plan. Finally for the extermination of the inventory the problems were related to the responsible committee who had clear knowledge of the rules and practices of their roles and duties. Training regarding in the inventory administration should be arranged for regular and continuous understanding
การต่อลงดินของระบบไฟฟ้าเพื่อลดผลกระทบของแรงดันไฟฟ้าตกชั่วครู่ที่เกิดจากการลัดวงจรแบบหนึ่งเฟสลงดิน
The faults in a power distribution system do not only impact to power outage directly. They also cause voltage sag problem spread over the system. A single-line to ground fault is about 70% of the overhead system faults. The magnitude and duration of voltage sag causes the economic damage of the system. This paper presents an analysis of the different systems grounding to mitigate the voltage sag in a power distribution system by using the technical analysis system in case of one phase to ground fault. The objective is to minimize voltage drop for users using the simulation with single line to ground fault in distribution system voltage level at 22 kV PEA’s test system by the computer program. The results show that the grounding method can mitigate the voltage sag and reduce the damage of the economic system.
อิทธิพลของของวัสดุปอซโซลานโดยระบบสามประสานต่อกำลังและความต้านทานคลอไรด์ของคอนกรีต
This objective research to study the possibility of used pozzolan material in the ternary blend by fly ash metakaolin and silica powder by replacement cement partially on the strength and resistance to chloride migration. Consideration of concrete with compressive strength in the range of 240-350 kg per sq. cm by varying the ratio of water/binder (w/b) there are three values are 0.4 0.45 and 0.50 and variable amounts of replacement cement some. The ternary blend of the fly ash metakaolin and silica powder of percentage of 0 2.5 5 10 15 20 and 25 by weight of cement. and the control specimens (w/b) without contain fly ash kaolin and silica powder the slump test in the range of 3-5 cm and the use superplasticizer to control the slump test of concrete. By casting specimens of cylindrical diameter 10x20 cm cube 10x10x10 cm and the beam size 10x10x35 cm after curing 28 days and test compressive tensile and flexural strength of concrete all specimens each ingredient by Chloride Migration Test method and the results showed that concrete is a mixture with pozzolan such as silica powder metakaolin and fly ash with amount increase replacement. The increase will help improve the quality of the concrete physical properties. The increased of compressive and Tension strength as the percentage increase especially to replacement cement increased by fly ash metakaolin and silica powder reduces the penetration of chloride in concrete respectively As a result of the porosity of the concrete with lower amounts of tightness concrete has increased