จำนวน Repository ( 2 )
การปรับปรุงกระบวนการผลิตลูกอมชนิดนิ่มโดยการใช้เทคนิคการแปลงหน้าที่ทางคุณภาพ : กรณีศึกษาอุตสาหกรรมการผลิตลูกอมชนิดนิ่ม
At present a problem found in the soft candy producing process in the food producing department of Company Case Study is time-consuming roller washing process due to an ineffective washing process. A roller is washed one by one from a total of 10 roller (a set) in one machine. As a result the operation rates of other producing processes have been forced to delay. The objective of this research is to resolve the problem found in the process of roller washing by designing a machine for washing a set of roller per time. The research begins from examining design concepts of roller washing machine from patents and the current quantity of water and stream used for washing before conducting design of a new soft candy type roller washer machine. And eventually the efficiency of new roller washer machine is compared with current one. The findings indicate that the newly developed design can reduce washing period from 24.48 minutes/set to 5.56 minutes/set and increase operation time by 18.92 minutes or accounting for 77.28 percent. Meanwhile water quantity used in the process is reduced from 124.82 liters/set to 28.35 liters/set and stream quantity used in the process is also contracted from 0.83 kilogram/hour/set to 0.18 kilogram/hour/set. This reduction can save expenses equal to 28795 baht/year. As the budget for making new roller washer machine is 53000 baht and payback period is only 1.84 year.
Productivity improvement of washing tables by setting standard time: a case study of stainless manufactories
The purposes of this research are to study and improve the productivity process of washing tables by setting standard time a case study of stainless manufactories. Nowadays the manufacturers don’t know the production capacity. That leads to the problems of manufacturers’ work control and late product delivery to the customers. The study is proposed to improve work procedures by designing operation process chart (OPC) the setting of operation stations Operation process chart time (OPC TIME) and finding the standard time in product manufacture. As for the operation process and the standard time setting the research revealed that the standard time of welding station in assembly process for the frame table sink tap nozzle high neck sink flick and welding station of all assembly parts were the first the second the third and the fourth respectively. The researchers’ suggestions were to add 2 welding machines and 2 workers in assembly process so as to work more efficiently so that it can decrease the total processing time from 855.24 minutes/set to 645.91 minutes/set or 24.47 % reduction.