จำนวน Repository ( 3 )
ความสัมพันธ์ระหว่างแรงจูงใจในการทำงานกับความจงรักภักดีของวิศวกรภาคสนามในอุตสาหกรรมอสังหาริมทรัพย์และก่อสร้างที่จดทะเบียนในตลาดหลักทรัพย์ แห่งประเทศไทย
The objectives of this study were to examine the level of motivation and royalty of site engineers categorized according to population properties and to investigate the relationship between motivations and royalty of the site engineers in real estate and construction industry listed firms the stock exchange of Thailand. The data were collected from 354 site engineers through the application of questionnaires. The statistics applied for the data analysis consisted of Percentage Mean Standard deviation Independent Samples t-test One-way ANOVA and Pearson Correlation Coefficient. The study demonstrated that the differences in gender age education position and work experience had influences on the royalty of site engineers at 0.05 level of significance. Moreover it was found that the motivational factors had a positive relationship with the royalty at 0.01 level of significance.
ผลิตภาพแรงงานของงานฉาบปูนผนังภายในอาคาร
The purpose of this research was to study productivity rate in concrete plastering of interior brick wall by studying 2 construction projects in Bangkok. The researcher divided the methods of labor productivity into two categories: (1) direct labor production technique and (2) field rating technique. The direct labor productivity technique of project A is about 1.38 m2/person/hr. and project B is about 1.19 m2/person/hr. by field rating technique project A had 77.75 % of workers in work status project B had 73.75% of workers in work status. The error rate was 4.08 % and 4.31 % respectively at the 95% confidence level. Project A has higher productivity rate than project B because project manager A chooses ready-mixed plaster for plastering. Project B selects cement mix (silica cement) mixed with fine sand cement mixer and water which take longer to prepare than Project A resulted cost of materials increase for 28.21 %.Meanwhile the working time for wall plastering could take longer for 13.77 %. It can be concluded that the selection of material for work is another factor affecting labor productivity
ผลกระทบของระบบความปลอดภัยในงานก่อสร้างที่มีผลต่ออัตราผลผลิต
The purpose of this research is to study the effect of a safety system provided for external wall plastering activity on productivity by studying a construction of commercial buildings. The safety system composed of (1) stable scaffolding system (2) providing clean and not slip walkways on the scaffold (3) installation of handrails not less than 0.90 meters in height along sides of the scaffold (4) installing safety nets around outside perimeters of the scaffolding (5) indicating working area (6) installing stairs (7) providing protection for people who works below (8) providing tools and equipments for transporting material which are safe and ready for using and (9) providing personal protective equipment for workers. Cost of the safety system is 79665 baht for a wall area of 1510 m2 or approximately 53 baht/m2. The prevention cost is quite high because it is an initial investment cost. However contractors could repeat theirs used on future projects. Productivity rates for prior and after the used of safety system are 1.16 and 1.13 m2/person/hr respectively. The productivity declines for approximately 3%. In addition our study found an impact of predecessor activity which is a brick laying activity. If brick walls are not well aligned and plumbed the working time for wall plastering could take longer for 8%. Meanwhile the wall plastering productivity could decrease for 11% and labor cost could increase for 12%.