จำนวน Repository ( 2 )

การเพิ่มประสิทธิภาพการขนส่ง โดยใช้เทคนิคมากิกามิ เทคนิคลีน และ อีซีอาร์เอส กรณีศึกษา บริษัท เอบีซี โลจิสติกส์ (แผนกขนส่ง) แห่งหนึ่ง
การเพิ่มประสิทธิภาพการขนส่ง โดยใช้เทคนิคมากิกามิ เทคนิคลีน และ อีซีอาร์เอส กรณีศึกษา บริษัท เอบีซี โลจิสติกส์ (แผนกขนส่ง) แห่งหนึ่ง

The research purposes were to analyze and search for wastes in the planning process and transportation of the automobile parts of a transport company in Samut Prakan using Makigami Lean and ECRS Techniques. The informants used in this study were the support staff working the planning process and automobile part transportation for the car assembly factory in the industrial estate Rayong Eastern Seaboard. Six employees from different work units took part in the in-depth interview as the research tool for the data collection. Statistics used in the data analysis including percentage and workflow analysis with related management tools. The study indicated that searching for the waste in the technical planning process with Makigami Lean and ECRS Techniques could help reduce the work time for 1060 minutes in each step.

2563
Improvement of Efficiency in Biodegradable Packaging Process
Improvement of Efficiency in Biodegradable Packaging Process

This industrial research was studied an improvement of efficiency in natural fiber production plant. The objective was improvement process by using IE techniques which this method was once green technology for industrial problems solving. Now process had build-up in process (WIP) due to unbalance times between trimming station and visual inspection of station. Therefore the research studied work of staffs; time study and data analysis through 5W1H were used for analysis of WIP root cause. The cause of problems founded were the transportation loss of between section had over necessity and loss of visual inspection for repair. Therefore it had bottleneck in process. Consequently the researchers applied ECRS in each working processed by separation of repair station. Repairs of items were isolated from the main flow path of the process. Calculating of work flow rate was used for identified operator for repair station. As a result of the above production improvement Times of visual inspection in a lot was decrease from 283.84 hrs to 160.19 hrs. It was decreased in 43.56%. In addition the effect of separation from the repair process made the total times of all process was decreased from 792.78 hrs/lot to 669.14 hrs/lot. It was decreased in 15.60% and decreased work in process had from 17 lots/day to no work in process.

2553