การประเมินสมรรถนะการป้องกันฟ้าผ่าระบบสายส่งย่อย 69 กิโลโวลต์ บนเสาไฟฟ้าโมโนโพล
การประเมินสมรรถนะการป้องกันฟ้าผ่าระบบสายส่งย่อย 69 กิโลโวลต์ บนเสาไฟฟ้าโมโนโพล

Most of Metropolitan Electricity Authority (MEA) electric power system is using overhead line. It is 94% in the system including subtransmission distribution and low voltage system. All of them were installed on concrete pole. At present many public facilities have been built such as Sky-Train. It causes more constrains for construction with concrete pole due to lack of right of way. MEA needs to using electrical monopole plays an important role. It’s easier than concrete pole for construction and it requires less construction area than concrete pole. The thesis evaluation of lightning performance in subtransmission line 69 kV study on MEA. Case lightning strike on overhead ground wire (OHGW) at pole top of electrical monopole with suspension insulator Focusing on three factors is pole top voltage critical current and back flashover rate (BFOR). ATP-EMTP software is used for simulation. The results show that BFOR is reduced by 79% on electrical monopole structure with suspension insulator compared with existing concrete pole. BFOR is also reduced by 33.17% on concrete pole with external ground wire. The results could be served as a guideline in subtransmission line design and improvement in MEA power system.

2564
การวิเคราะห์แรงดันตกคร่อมหัวสายเคเบิลใต้ดินที่ใช้รูปแบบการจัดวางสายของการไฟฟ้าส่วนภูมิภาค
การวิเคราะห์แรงดันตกคร่อมหัวสายเคเบิลใต้ดินที่ใช้รูปแบบการจัดวางสายของการไฟฟ้าส่วนภูมิภาค

System of The Provincial Electricity Authority using the grounding wire connected between the cable end and Surge arrester format it is connect the cable from the end of the cable set to the end of the Surge arrester and grounded wire that splits the ground between the cable connecting point and the Surge arrester format it is a separate grounding connecting point to the cable end and Surge arrester on both sides of cable riser pole by Computer program. Resulting from computer analysis and the comparison of line setting found that if setting line lead to ground and join with ending cable line and Surge arrester lead in to line voltage drop less than setting line to ground with separate line and Surge arrester.

2563
Semi-automatic mapping of electric poles using sfm technique
Semi-automatic mapping of electric poles using sfm technique

The objective of this research is to proposed a semi-automatic method for mapping electric poles using the structure from motion technique or SFM. First an epipolar geometry for each image pair is estimated. Then the 3D structures are obtained using incremental SFM technique which will give us both 3D point cloud of the study area and camera parameters. Also vertical 2D lines are extracted from the input images. These 2D lines and the 3D structures are then integreated for estimating the positions of electric pole in 3D space. Finally these 3D electric poles are then geo-registered by estimating 3D rigid transformation from embeded coordinates in the input images.

2558
Laboratory system electric field From electric pole
Laboratory system electric field From electric pole

The experimental models of electric fields were set up by using 4 forms of electric poles a point - point point - rod parallel rod and coaxial ring. The equipotential lines and electric line of force were drawn by using Microsoft Office Visio Program 2007. The drawing of equipotential lines and electric field had shown the direction of electric field moving from the positive electrode toward the negative electrode and perpendicular to the equipotential line. The point - point poles in 10 cm. distance have constant and the highest electric fields which is 28.64 V/m. The electric fields of point - rod parallel rod and coaxial ring are 60.51 V/m 45.81 V/m and 181.98 V/m respectively.

2554
เครื่องกำเนิดไฟฟ้า 5 เฟสแบบเส้นแรงแม่เหล็กไหลตามแนวแกนเพลาขนาด 1 กิโลวัตต์ ประยุกต์ใช้กับพลังงานลมผลิตไฟฟ้า
เครื่องกำเนิดไฟฟ้า 5 เฟสแบบเส้นแรงแม่เหล็กไหลตามแนวแกนเพลาขนาด 1 กิโลวัตต์ ประยุกต์ใช้กับพลังงานลมผลิตไฟฟ้า

This research project presents about the design and construction of a five-phase generator for producing magnetic force along the shaft axis that there are various important elements which should be considered in the processes of the design and construction such as flux per pole number of poles number of turns rotor speed and winding coefficient of coils. The experiment result is found that the five-phase axial flux permanent magnet generator along the shaft axis can produce DC voltage by the efficiency without load and with load. Furthermore this contribution can be used to produce electricity with other renewable energy such as electricity from wind energy.

2563