จำนวน Repository ( 13 )
การปรับปรุงประสิทธิผลโดยรวมของเครื่องจักร ของระบบการกรองน้ำของโรงงานผลิตน้ำขนาดใหญ่ โดยใช้การบำรุงรักษาทวีผลโดยทุกคนมีส่วนร่วม : กรณีศึกษาโรงงานผลิตน้ำประปาแห่งหนึ่ง
This research objective is to improve the overall equipment effectiveness of the water filtration systems in the case study of the Water Treatment Plant which divides the water production into 4 production lines. The water filtration system has an electric actuator and gear is the main machine in the water filtration system. An electric actuator and gear have more machine breakdowns. That makes the water filtration system is the bottleneck of the water production process. This research study is divided into two steps: the first step is the presentation of the equation and the steps to measure the Overall Equipment Effectiveness of the water filtration system. The equation used data from the computer maintenance management system to analysis on mean time between failure data (MTBF) mean time to repair data (MTTR) and water production process data. The results can be improved the overall equipment effectiveness of the water filtration system increased to 0.11% 0.68% 0.44% and 2.44% respectively in each production process line. And increased Quantity of Filtration Water increased to 328500 m3/year 1168000 m3/year 1022000 m3/year and 3832500 m3/year respectively in each production process line. In this research used the pillar of focus improvement. By adding a protection system to prevent machine breakdown because of the most of the problems are found that the protection system malfunctions. This is the most problem in the 4th And then used engineering knowledge to improve water production and the success factor are required a human resources of all parties to cooperate brainstorm and analyze the causes of various losses in order to eliminate them.
การศึกษาการบำบัดน้ำเสียจากการย้อมผ้าแบบเคลื่อนที่โดยใช้ถ่านกัมมันต์จากกะลามะพร้าว
The dyeing industry both of business size and household size where the remaining water from the dyeing process is dumped into pipes and flows into natural water sources causing sewage problems. Therefore a column type wastewater treatment system has been developed by using a filtration system along with an adsorption system. The materials used to treat the wastewater from dyeing are gravel sand charcoal from wood and activated carbon from coconut shell. The study was conducted on the synthesis activated carbon from coconut shell using for color and molecules adsorption. The amount of activated carbon from coconut shell was varied at 200 400 600 and 800 g applying with filter media and other adsorption materials taking 1 hour to treat the wastewater from dyeing. The parameter using to measure water quality consisted of color value pH suspended solids conductivity turbidity value COD and TKN to indicate the water quality before and after treatment evaluating the efficiency of the wastewater treatment system. The best ratio that can treat the color is the formula containing 800 g of coconut shell activated carbon. It was able to treat the color equal to 5.94 SU or 99.43 percent compared to the wastewater before treatment.
การบำบัดน้ำเสียจากสีย้อมผ้าด้วยกระบวนการโอโซนเนชัน โดยใช้ตัวกลางพลาสติก เคลือบผิวไทเทเนียมไดออกไซด์ชนิดรูไทล์เป็นตัวเร่งปฏิกิริยา
This research is to study the efficiency of treating wastewater from dyeing fabric by the ozonation process. By using rutile TiO2 coated plastic media to catalyze. Which uses O3 generators with a capacity of 2.62 - 3.10 g/hr. By studying the factors that affect the treatment efficiency of COD and color such as the pH of the water used in the treatment at pH 3 pH 7 and pH 11 the initial COD concentration of 100% 50% and 25% which have values in the range of 100 -320 mg/L. O3 exposure time 120 min. From the study it is found that the efficiency of reducing the impurities in wastewater by the ozonation process in the pH 11 state the COD concentration at 50% can reduce the COD. And the maximum color is at 33.3% and 90% from the 550 ADMI color intensity with a COD of 180 mg/L. For the study of the efficiency of reducing the impurities of wastewater by ozonation process together with 2 g. of TiO2/1 L. of wastewater in the condition of pH 11 concentration COD Beginning at 100% with the ability to reduce COD values And the maximum color is at 40% and 80% of the 270 ADMI color intensity with a COD of 190 mg/L. The amount of O3 suitable for treatment has an average value of 0.0374 g/min./10.5 L. of wastewater. The duration of O3 exposure in both processes has a similar approach to the efficiency of COD and color treatment when increasing the duration of O3 exposure.
Conduct of sludge from wastewater treatment of milk production transform of fuel case study : frieslandcampina fresh (Thailand) co.,ltd
This study was experimental study that had the propose to investigate the possibility of using sludge from wastewater treatment of milk production in case study of Friesland Campina Fresh (Thailand) Co Ltd. This study to investigate suitable ratio in making briquette between sludge and banana peel in ratio 95 : 5 75 : 25 50 : 50 25 : 75 and 5 : 95 by weights and analysis of compressed char were Moisture content Ash content Volatile matters Fixed carbon and Calorific value. The result of this study we found that sludge mixed with banana peel at the ratio of 25 : 75 had Moisture content 9.7 percent Ash content 15.8 percent Volatile matters 61.8 percent Fixed carbon 9.7 percent and Colorific mean 4195 kcal per kg. It can also be used briquette fuel substitutes of firewood in order to conserve the forest resources.
Efficiency of vetiver grass variety songkla 3 cultivated in domestic wastewater treatment with floating platform technique
The purposes of this experimental project are learning and comparing the result of the Vetiver confine time and the health of the plants in the community waste water. The waste water of this experimental are collected from the low-cost housing project Bang-Kruay (Pha-ngung Temple) in Prai Bang sub district Bang Kruay district Nonthaburi province. The experimentation of this project was built the 2 potholes. The first pothole was set by grow up the Songkha 3 Vetiver with the floating platform and the Songkha 3 Vetiver while the second set had only the floating platform without plants as a control. However both of the potholes were control the lead time of confine the Vetiver on 7 14 and 21 days. Parameters of this project are BOD SS nitrogen and the phosphorus. The result showed that the pothole with the Songkha 3 Vetiver was effective more than the pothole that without the Vetiver. The best lead time of confine is 7 days and the performance of BOD SS nitrogen and phosphorus are 83.32 80.31 78.88 and 76.55 that calculated in percentage. Moreover during the test process the Songkha 3 Vetiver are treated and had the survival in 100% well grew up had the new spires roots and the leaves. The waste water was on clear less sediment no foul odor. The Songkha 3 Vetiver was effectively for the community waste water treatment with the floating plat form. From the result it can be treat the BOD and SS till 14 days the