การควบคุมกำลังไฟฟ้ารีแอคทีฟเพื่อเพิ่มมูลค่าทางเศรษฐศาสตร์ ในระบบไฟฟ้ากำลัง
To Improvement the power factor is very important. Because the costs are increased or reduced. To Improvement the power factor the higher the value it is necessary to buildings offices and industrial buildings or the fact that the industry needs real power. And reactive power source to operate. This research presents the design and construction of reactive power factor control. Which amounted to 6 working order by the first sequence is divided into three three-phase electrical power system and three consecutive singles phase by active power different. first1 is reactive at 5 kVAr second 2 and third 3 are reactive at 2.5 kVAr forth 4 fifth 5 and sixth 6 precious marine active 0.83 kVAr control. the power factor controller that controls RG3-12 pay Oval active in various sequences. As a result when not equipped with reactive power compensation software to control the power factor. This makes the flow of the high and low Power Factor schedule. When equipped compensate reactive power source to power factor control. Single-phase motor 1 kW and light bulb 1640-watt making the current decline of 14 amps rest 12 amps of the power factor increases from 0.5 to 0.929. When connected to three-phase motor with 2 kW 0.8 2.2 flow down from 2.360 rests 0.942 amps of power factor value up from 0.308 to 1.0.
การวิเคราะห์ผลกระทบของฮาร์มอนิกเพื่อแก้ปัญหาเศรษฐศาสตร์ในระบบไฟฟ้ากำลัง
This research proposes technical performance evaluation and economic decence for the combination of harmonic correction devices in Industry. Currently an electronic device is popularly applied in power network. Although it is a higher performance device than the existing device it still causes the power quality issues and then network failure. Especially harmonic disturbance in the network it is a harmonic source that generates harmonic current into the network. Many types and solutions are available in the present time therefore the suitable and optimal financial solution must be considered. A network model for the analysis of harmonic correction devices suitable solutions and optimal financial has been established in the simulation software that bases on the power and Break Even Point (BEP) equations. The results of analysis shown that the performance of harmonic correction devices suitable solution and BEP of investment in match to the using of a detuned filter bank and an active harmonic filter (case 8) thus these information will be valued for the end-user.
การวิเคราะห์แรงดันตกชั่วขณะเมื่อมีการติดตั้งแหล่งผลิตไฟฟ้าแบบกระจายตัวในระบบจำหน่าย
This research presents an Analysis of Voltage Sags on the Installation of Distributed Generation in the Distribution System. The computer program PSCAD/EMTDC (Power Systems Computer Aided Design / Electromagnetic Transient in DC system) version 4.2 is applied to provide electrical parameters for the modeling and simulation and to analyze the fault occurred which resulted in voltage sag. Test results from PSCAD/EMTDC show the values of voltage sag when 5 types of fault are occurred (Single Line to Ground Fault Double Line to Ground Fault Three Phase to Ground Fault Line to Line Fault and Three Phase Fault). For all cases the value of root mean square voltage before fault is 100% or 1.0 pu. It can be seen that for both radial line and closed circuit when DG are installed in the system the value of phase to ground RMS residual voltage and phase to phase RMS residual voltage at the bus of Bang-pa-in 2 substation are more than the values in case of the system without DG.
การลดผลกระทบจากฟ้าผ่าในระบบจำหน่ายไฟฟ้า
Most of Metropolitan Electricity Authority (MEA) electric power system is using overhead line. It is 94% in the system including subtransmission distribution and low voltage system. All of them were installed on concrete pole. At present many public facilities have been built such as Sky-Train. It causes more constrains for construction with concrete pole due to lack of right of way. MEA needs to using electrical monopole plays an important role. It’s easier than concrete pole for construction and it requires less construction area than concrete pole. This research evaluation of The Reduce Effect of Lightning on Transmission Line. Case lightning strike on overhead ground wire (OHGW) at pole top of electrical monopole with suspension insulator Focusing on three factors is pole top voltage critical current and back flashover rate (BFOR). ATP-EMTP software is used for simulation. The results show that BFOR is reduced by 79% on electrical monopole structure with suspension insulator compared with existing concrete pole. BFOR is also reduced by 33.17% on concrete pole with external ground wire. The results could be served as a guideline in subtransmission line design and improvement in MEA power system.