จำนวน Repository ( 3611 )
โครงการออกแบบพื้นที่เรียนรู้ธรรมชาติป่าไม้ดอยอินทรนนท์ ในการณีศึกษาความสัมพันธ์ระหว่างพฤติกรรมการเรียนรู้และกายภาพ ดอยอินทนนท์ อ.จอมทอง จ.เชียงใหม่
Doi Inthanon Forest Nature Learning Area. Case study on relationship between learning and physical behavior of Doi Inthanon is a project that creates experimental architecture caused by finding a balance between learning behavior and the needs of the context to be consistent with the physical forest education on. Doi Inthanon in each area Which Doi Inthanon has a learning area that varies according to the overlapping of different nature in many forms according to the study area A. The first form is an open area in the community area. B. The second form is a semi-overlapping natural area. C. The third form is the natural overlap area. There is a form of usage based on the freedom of the user. Therefore the purpose of the project is education. To find ways and tools to design and create a space to connect users with nature Including being a learning area for those who are interested Using architecture as a link to learning relationships In order to be appropriate for the behavior of the physical user with the aim of studying this thesis topic as a case study In creating experimental architecture in each area of Doi Inthanon By using learning behavior of users in each area to study and experiment to form images To meet the needs of the area The interaction and consistency between the architecture people way of life and context
การควบคุมความถี่ -โหลด ของการเชื่อมต่อระบบการผลิตไฟฟ้าจากโซล่าร์ฟาร์มและกังหันลม
The effects of load frequency control (LFC) of interconnected distribution power system in tie-line substation area load –frequency stability and the frequency respond at distribution generator (DG) are very important for interconnected control power system of tie-line area. The generating power system of solar farm and wind turbine which have interconnected distribution power system in tie-line substation area were tested using 3 simulation parameters: non-controller Automatic Voltage Regulator (AVR) and with Pl Controller. The results showed that there were 3 types of load and frequency changing in the interconnected area: load changed 0.02 p.u. had frequency of load changed 0.025 Hz and large disturbance. Comparisons of load-frequency to respond for steady state the time respond was 7.9 seconds for non-controller 5.4 seconds for AVR and 1.7 seconds for under controlled system at 0.1 p.u using Pl controller. Therefore the Pl controller has better efficiency than non-controller about 31 % and AVR about 16%. It can be concluded that the interconnected distribution power system in tie-line substation area controlling for storage for connected grid had better efficiency and optimization of generating power from renewable solar farm and wind turbine which have interconnected distribution power system in the nearby are balance of controlling of the original system.
การจำลองกังหันลมเชื่อมต่อระบบกริดไฟฟ้า 1 เฟส
This research project presents about wind turbine simulation for connected single phase grid system using hysteresis current control technique to generate PWM signals for controlling a single-phase voltage source inverter. The simulation system presented here uses the program. MATLAB/Simulink in the simulation of the wind turbine connected to the shaft of a three-phase permanent magnet generator is produced by alternating current through the full bridge rectifier circuit. Then the power supply is applied to the single-phase inverter circuit which is connected to the single-phase autotransformer to power transfer to the single-phase grid system. The simulation results confirm the validity of the proposed system with satisfaction under various conditions.
การศึกษาประสิทธิภาพทางแม่เหล็กจากวัสดุคอมโพสิต ที่ใช้ในอุตสาหกรรม
The magnetic properties of Ba2FeMoO6 (BFMO) BaCO3 (Barium carbonate 99.9%) Fe(NO3)3.9H2O (Iron(II) nitrate 99.0%) and Mo03 (Molybdenum trioxide 99.0%) have been characterized. A slurry was prepared by mixing the powders with deionized (DI) water at a ratio of 1:7.5: by solid state reaction method through compression. In the case of BFMO sintering at 800 °C for a 4 6 and 10 hours. exhibited the largest hysteresis loop at 50 K. In addition the values of Ms and Mr indicate ferromagnetic behaviour in BFMO ceramics sintered from 600 °C to 800 °C. Finally the value of magnetization was reduced by using a lower sintering temperature SEM analysis revealed the physical appearance of sintered BFMO ceramic and showed the morphology of the BFMO powder was. coarse with an average diameter of 2 microns
การตรวจสอบความเป็นสารปอซโซลานของเถ้าแกลบผสมเถ้าลอยโดยวิธีการบ่มเร่งกำลัง
This paper presents the investigation of pozzolanic reaction of rice husk ash blended with fly ash by accelerated curing. The compressive strength of cement paste containing rice husk ash blended with fly ash at 30% by weight of cementitious material (PBA-30) was studied. The temperature curing at 60 70 and 80oC were parameter of test in order to determine the suitable temperature and curing period on strength development of cement paste. The ratio of rice husk ash to fly ash was 1:1 by weight and the ratio of water-to-binder (w/b) was 0.38. The test results found that the accelerated curing of PBA-30 at temperature of 60oC for 5 10 and 45 hours had comparable compressive strength to PBA-30 with normal curing at the age of 37 and 28 days respectively. As a result of accelerated curing the calcium silicate (CS) which effect on strength development of cement paste was increased. According to the X-ray diffraction analysis the calcium silicate content in cement paste was comparable. Therefore it can be use accelerated curing to investigate the poozolanic reaction of rice husk ash blended with fly ash within 48 hours.